Trackwork

Track Close Along a Wall Behind a Viewblock
Track Close Along a Wall Behind a Viewblock

Amherst Railway Society layout
Amherst Railway Society is finally building a club layout after 50 years. It's a very simple 2-track loop.
In 1 1/2 inch scale.

locomotive motor problems
i think i need a new motor for this old AHM Atlas ,by itself the motor runs, hook it up to the gear trucks it doesnt go, cleaned the gear cogs in the gear boxes, and cleaned the wheels still a no-go. the motor is humming, and wanting to turn but doesnt..
any suggestions???

Railroading Books - Real and Model
Michael T. had a post about the Scenery book of his youth and the new found copy. I got to thinking about my books and thought I'd share them. I added the covers to Imgur and was going to share them, but thought it would be a major task with 174 of them! Instead, here is a single graphic with the thumbnails!
Arduino / route control for Wye question..SOLVED
Has anyone here used an arduino / servo combination to control routes using rotary switches? I have a staging yard and a wye that I want to use Arduino and servos to control routes. I have rotary switches like the one shown. One is a 5 position (staging) and the other is 3 (wye). I will be starting this soon, and if anyone has anything to share on this before hand.. that would be much appreciated. Thanks
Update: solution in comments..

As the Table Turns
Some months ago I submitted this post attached to another very old thread.
I am working on to recreate the 70 foot turntable used by the Southern Pacific at Port Costa, California.
Laying out a smal classification yard
I am in the initial stage of designing a small HO layout. To get started I am going to try and do some of the planning by hand. I am using the ME #6 turnout template as a starting point. I want to have the yard tracks on 2 1/4" centerline spacing. How do I determine 1) where the first straight section of the first yard track should start in relation to the end of the diverging route of the turnout; 2) how to connect the first yard section to the turnout (i.e. small straight section followed by a curve of some radius).
Track grades
What is an acceptable grade when designing a layout. I have a rise of 1/2" per every 100" of track. Using 2 gp- 40's I can pull 15 cars well. I have weighed my cars to nmra standard and they run well. Are my cars too heavy or is my grade too high. Could use some advice. Thanks, Chuck
Central Valley Turnouts
Reviewing the instructions for the Central Valley turnouts it says to glue down the tie blocks to your roadbed as a first step. Can the CV turnouts be built without this step to allow building the turnouts before track laying starts to allow you to stockpile a number of turnouts? Using the FastTracks jigs you can build the turnouts in advance.

Need some mechanical advice
I need some advice: I'm using G-scale switch stands to throw my HO scale turnout points. There's an adjustable set screw at the bottom of each stand where a cable attaches to the open end (seen on the right in the photo attached).
>> Posts index

Navigation
Journals/Blogs
Recent Blog posts: