Modeling topic

HeavyObject's picture

SD-40-2 Grab Irons?

Hello,
I'm detailing a SD-40-2 and need some help.What is the correct size for grab irons? 17" 18" or 24" 

More Track Cleaning

Somewhere I ran across the idea of using dry graphite to keep track clean.  

I should let you know that I was operating DCC on an On30 layout.  Prior to converting to DCC I cleaned track every few months.  But DCC is fussy about clean track.  After converting to DCC I was cleaning track before every operating session and still got some hesitations and stalls. 

I acquired some artists graphite from the local variety store and gave it a try.  

MTH F3 bad actor

Has anyone had any issues with the MTH F3 with Proto Sound?

I have been given the task of trouble shooting the buga-boos in this loco. 

The loco was sent to me and was reported to stop dead when the horn was engaged and is jerky when it runs. When it was reset using F8=8, it did not change anything but the cab number back to 03.

Will_Annand's picture

model rail how to create a river spanning two modules?

I an rethinking part of my layout. To make it completely modular, I was thinking on having the corner modules as 24" x 24" separate modules. But at one corner I have the river coming out from the corner and ending on a second module. Is there a way to create a river that spans two modules?

Car Float Rail

All,

Looking for suggestions on how to secure code 83 rail to a scratchbuilt carfloat. I'm planning on using MDF covered by styrene for the body. I saw a MRRV video on the Rice Harbor layout where they used PECO inspection pit parts to secure the rail. That works for a two track float when the float rails are straight.

Chief.Buffoon's picture

Connecting a remote dispatcher to the local crew's FRS radios

Does anyone have experience with running op sessions using a remote dispatcher, and connecting that person in to the FRS radio system used by the local crew? In theory, this looks like it could be done fairly easily using a computer that is running Google Voice, Hangouts, Skype, Mumble, or any other voice-over-IP solution. My thinking is that some fairly basic impedence-matching hardware between the computer and an FRS radio should work. The radio would have to run in VOX mode.

rgs_info's picture

Video - test train up Keystone Hill (toward Telluride)

Let's try posting a video - this is test train on newly-scenic'd area, coming off the Ophir low-line, through what will be Vance Jct, and starting a 4% climb on the branch to Telluride.

Not sure this will work - but let's try...

 

 

nogoodnik's picture

Sandpiper Bay Terminal

This is the layout I've been working off and on for a little over 2 years. This is my second larger layout (beyond the size of a sheet of plywood), but this is the first one that was planned out better and hopefully will reach completion some day. It is not so large that it can't be built by one person.

What’s on your workbench?

I’m starting to think about home.  What is on my workbench?   Cleaned up before leaving....   Gotta rely on your pictures and thoughts!!!

Let’s go!!!  Have a good!!!


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: