Modeling topic

rickwade's picture

Shack and Outhouse

I happened across this shack and outhouse that I had on my previous layout and just placed them on the layout for the picture.  Now I need to decide where they should reside.

Allen H.'s picture

Next stop: Fordyce, AR and it's buildings

Ok, moving onto the next town and project. This time it will be Fordyce, AR.
Here's a shot from about 2 years ago just after I finished re-aligning the track.

Anyone have experience with the new Atlas All-Scales Signaling System?

Anyone have any experience with the new Atlas Signaling System? I am planning on a small layout (4x8, 5x9, 4x8 with a 4x4 extension on one side). I'm not interested in ops-sessions. My aim is a computer-controlled system so at most 1-2 operators so I'm looking for something simple, a basic ABS system and don't want to put the time into a more elaborate system. I'm looking at either a Digitrax or NCE DCC system.

Central Valley Turnouts

Reviewing the instructions for the Central Valley turnouts it says to glue down the tie blocks to your roadbed as a first step. Can the CV turnouts be built without this step to allow building the turnouts before track laying starts to allow you to stockpile a number of turnouts? Using the FastTracks jigs you can build the turnouts in advance.

Jiffy Rerailer

Several years ago there was a discussion about retailers, specifically the Jiffy Rerailer. I gather from that discussion that Jiffy is no longer in business. I cannot find them anywhere on the web.

I am looking for a compact retailer to use in staging and before/after a lift out section as "insurance". Obviously the Atlas rerailer is readily available but it is has a high visual footprint.

Does anyone know if another manufacturer has picked up the Jiffy design?

Loco Patch Out & Black Paint Fade

This is a multipart call for help. So I'd like to patch this loco out for my home road and fade the paint.

So do I do the paint fade first and then the patch out or the reverse of that procedure?

How do I get a good fade on black, we've all seen the ex PC locos that Conrail had they were almost gray?

And lastly I haven't decided on wether to do a complete patch out or fade the lettering to an almost unreadable state and put my reporting marks and number over those, what is the best way to fade out lettering/logos should I decide to do that?

Goose in The Caboose Productions's picture

Couple things off the workbench.

Hey everyone, Here,s a teaser for one of the projects I'm working on. This was one of the very first f-units I got, A-B-A lashup of blu-box F-units. B-units about to get a sound-chip, motor, etc., and the other A-unit will eventually get the same treatment. Weathered with a light coat of grime and some rust on the truck sideframes.

Allen H.'s picture

The piping at Gavlion

Just a note, this scene is not finished.  

Marc's picture

AAA turntables

 

Does anyone know if AAA turntables are still in buisiness.

The website doesn't seem to open anymore.

Knowing they made the Cadillac of turntables in all scale this is another missing company if they have closed.

smadanek's picture

Elmer's Foamcore Enhancement

I am looking for opinions and constructive advice on my planned subroadbed and roadbed methodology for my new layout.


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: