Blogs

Switch Machine Set Up for NCE-DCC Layout
Part I is about setting up and programing decoder to run switch machine on a NCE-DCC system. Use of terminal strip applies to all layouts DC- or DCC. Part II will deal with the physical part of the installation.

The WP&GNMRR
Some photos of my layout the WP&GNMRR (The Western Pacific & Great Northern Model Railroad)
I will add new photos as the scenery progresses.

Crossing Canada by HO Streamliner
I was attracted by this photo in a UK national newspaper of apparent flooding on the CP main line in British Columbia.
The full story is here:
http://www.telegraph.co.uk/travel/picturegalleries/9683080/The-Canadian-...

A portable display layout.. part 2
Okay, it's not going nearly as fast as I need it to - partially because I was too afraid of making a mess. I forgot how much diluted glue doing something like this takes....
So, I've carved a hill that I'll hit with Celluclay and put in a parking lot and the start of a "woodchip" path:

Micro Engineering , Peco or Central valley tie,proto87 ?
hi all
I begin my new layout and i dont know witch track to choose.Micro Engineering,Peco,central valley tie ,proto87.
I am very crazy for the prototype ! Mainline etc,,,,
I prefer the code 83 and 70 in HO track.
Mike Confalone :; he prefer the Micro Engineering track and turnout.
and you Mr everybody?
>> Posts index

Navigation
Journals/Blogs
Recent Blog posts: