Blogs
Who built the DPM buildings in Lansing, IA?
Deb and I saw this traveling through Lansing, Iowa a couple days ago on an outing:
Tichy USRA Hopper Car set of 6 Build...
This blog will be a record for a build of Tichy's 6 pack of USRA hopper cars.
Dave
PDC (Precision Design Company Easter Egg)
Well I was looking at the instructions for extreme load number three and noticed a little bit of humor.
Look at the end of step 5
It really does look like one though..
If you thought T Scale (1:450) was small check out TY Scale (1:900)
I was just browsing around looking for some interesting railroad things and found this noteworthy one. I am not sure how many people have heard of TY scale (I am sure most have heard of T) but it is small following I will have photos comparing T and TY scale sadly none of them together but they will give you the idea of size.
The largest of these is 4"x7"
Control Panels
I am planning the 5th (hopefully the last as I am getting older each year) iteration of my switching layout for me and up to 5 operators. There is one thing I, and perhaps others, need help with - a suitable control panel for my Zypher, accessories power pack and all the buttons/switches etc. that need to be centralized. Most photos posted show these beautiful fascia single and double deck layouts with sweeping panoramas, extravagant lighting and people with walk-around throttles. I'm looking for the guts of an operation for smaller layouts.
John Allen Time Saver Puzzle In Lego
I seem to be good at finding interesting Lego items and here is another. This is a Microscale Lego Timesaver Puzzle based on John Allen's Design.
An image--
Carl Arendt's E-Books are now available at Amazon!
Dear MRH reader,
Just a quick message to let you know that I've made Carl's E-Books available on all Amazon stores, so you can easily purchase an e-book in your own currency (If there is an amazon store available in your country) and push the ebook to your Kindle device or Kindle app if you want... :)
Progress on the C&E extension
With 2015 nearing its 4th quarter, I think it's time to take a brake and step back to get an overview of the expansion project I scheduled for 2015.
While starting operation on my layout mid 2014 I found that I had too few industries along the road and drew a plan to get at least some more coal industries in.
New floor and skirts
The layout room is starting to look presentable. I added new flooring and skirts over the past few days.
see http://www.usmrr.blogspot.com/2015/09/dont-spill-paint-on-it.html for more info.
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: