MRH News Online

ALPINE RAILROAD IN NJ-EVOLUTION IN PICS PART V

Now that I have gone over most of the build for my layout up to present day (I will take pics of the newest table with the mountains and rock faces in place and post them soon), I thought I would show some of the details I have been working on like tunnel portals, bridges and structures. Since I didn't take any before pics of the portals or bridges before I painted/weathered them, I found pics online of what they look like out of the box.

ALPINE RAILROAD IN NJ-EVOLUTION IN PICS PART IV

After fixing my problem with getting my locos up a 2% + grade (it was never consistent for the entire run) I then saw another aspect of my original plan that I never really loved. At that point I had my loco run up hill about 4 inches over the course of 8-10 feet or so but coming back down hill was done inside another tunnel on the opposite end of the layout in about 3 feet. Needless to say it was a steep hill downward though a few tests showed that locos would not fly off the track or even move that much faster so it was doable but I didn't love it.

ALPINE RAILROAD IN NJ-EVOLUTION IN PICS PART III

Due to the nature of my job I was unexpectedly out of work from last Christmas until te beginning of May which presented a wonderful opportunity to fill the cold winter days by working on my layout uninterrupted. In that time I feel like I achieved quite a lot on the layout construction itself as well as building structures and whatnot. Like most railroad modelers, I tend to get "on a track" of maybe wiring for a while then when I get bored I shift gears and build a structure or two or maybe work on scenery.


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: