Layout tour
November 2019 op session
Here's my updated blog with a report and lots of photos from the Nov 2019 operation session.
http://rgsrr.blogspot.com/2019/12/operations-in-nov.html
The Viaduct crossing
Here is a little update on my Layout , i have named the Louisville & Northern , Based on a branch division somewhere in Central /southern Indiana and Northern KY area.
here is a few pics of the viaduct as it is right now, i used Aluminum Square tube and flat bar, next step is to add the details to give it the Iron plate style appearance hopefully i will have a few viaduct towers to add underneath, before painting
it also is a left hinged lift up for when i dont feel like ducking under
Traveling around the USA looking at, running and taking pictures of some Model Railroads in 2020.
Hello again!
Another year and some more layouts to look at I hope!
Chippewa, Marquette, St. Charles and Pacific Layout Pics
Since Joe asked for some layout pics in a previous post I though I would make a new entry. As with most layouts the Chippewa is under construction.
The picture below is base on the old Kate Shelly bridge her in Iowa. It was constructed from Evergreen Models structural shapes (ordered in bulk). It is 14.5 ft long and stands 60 inches off the floor so the center can be used as a duck under. This took about a year to build.
Good morning from Raleigh, NC - Sipping & Switching Society of NC layout
Good morning all!
About 40 members of the Sipping and Switching Society of North Carolina, Ohio Valley Sipping and Switching Society, Wilmington Model RR, Speed-Mo, and Free-mo modular groups got together yesterday to fill a void.
First Time Poster - Pacific Coast Railroad
I've never posted to MRH before, but I do get a lot of benefit from the publication and would like to start participating. I'll leave a few photos of my layout to start.
It's a freelanced California line supported mainly by coastal logging. It would have been located a little bit south of the California Western and routed approximately parallel to that line from Albion on the coast to Laughlin where it interchanged up with the Northwestern Pacific. The year is 1928.
Glacier switching layout/module
It's been a while since I created a post here, but I've been busy building a switching module that can double as a small interchange when used in larger modular layout.
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: