Layout tour
Installed -Tri-County CO-OP Control Panel with Programming Track
Just completed installation of the control panel with programming track for the Tri-County CO-OP on my layout, the Trenton Subdivision in N Scale.
Building of the Little Pacific railroad EP 6 (Start of narrow gauge and mountain) - Video
IAIS's 4th Sub - Layout tour
Now that the stained ties make it easier to see the tracks, I thought I'd do a quick drone tour to show how everything fits together on the new layout. Photos to follow in the first reply, but here's the layout plan again to help make sense of it all.
W&N Layout Tour Video
I have made a video layout tour of my layout and its available on You Tube :
Layout Tour Part 1 - Finger Lakes Railway HO Scale Layout
Part 1 of a 2-part layout tour - Layout Tour Part 1
Visiting the Skeene Valley Northern- Hear Stories From the Layout's Creator, a Retired Railroad Man!
This is without a doubt my most special layout visit ever. Listen to veteran, local legend, and retired D&H employee Jim Lafayette share stories from the railroad as we follow a local train around his Skeene Valley Railroad.
The S&NE Railway
I’ve posted the beginnings of a new journal on the new (temporary) forum site. I hope you will check it out and comment!
Thanks for looking.
Red Rock Northern
A friend of mine introduced me to this blog and encouraged me to share the HO scale layout I started building in 2016 in Lakeville, MN. The Red Rock Northern is described as a freelanced short line in rural America. It was designed by Jerry Boudreaux and featured in the June 2007 issue of Model Railroader magazine as an 11x9 which I've stretched slightly into an 11x10 spare bedroom. It operates as a twice around the room point to point but also allows continuous running. Minimum radius is 24" and maximum grade is about 2.5-3%. Main road is Burlington Northern.
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: