Coal and steel rr's blog
O gauge layout update May 23,15
Sat, 2015-05-23 18:24 — Coal and steel rr
I have been worked on a PRR freight house, more work on Operation and wiring.
https://m.youtube.com/watch?v=z4k1gfoUAEU
Operation session On the coal and steel railroad April 29, 2015
Wed, 2015-04-29 16:12 — Coal and steel rr
Operation session today on the Coal and Steel RR.
My regular operator and me, operated the layout today. I was dispatcher, we both took turns on being the conductor and engineer.
Running trains at CVT Model Railroad Club yesterday
Sun, 2015-04-26 03:37 — Coal and steel rr
Running trains at CVT Model Railroad Club yesterday
ttp://nkp765fanprrfan.blogspot.com/2015/04/running-trains-at-cvt-model-railroad.html
https://www.youtube.com/watch?v=eBm5kTxdghg
https://www.youtube.com/watch?v=hcb_ZnNQN0k
https://www.youtube.com/watch?v=S3NIuLeODkM
https://www.youtube.com/watch?v=DMrCBaZNayM
Coal and steel rr track warrant/time tables and train orders form No.3
Fri, 2015-04-24 18:32 — Coal and steel rr
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: