Coal and steel rr's blog

Layout update 2/18/2015

I have been working on the Prr signal, wiring up accessories in Conway and more.

https://m.youtube.com/watch?v=ks0Uh3tEx0o

O gauge layout update 2/12/15

More work on the staging yard and fixed one of my throttles.

https://www.youtube.com/watch?v=SqOrDHJwPgo

How car card and waybill work part 2

This video goes into more detail about my Car Card & Waybill System. Car forwarding systems are a great way to add operational interest into a model railroad and give it a sense of realism and prototypical purpose.

https://m.youtube.com/watch?v=9g1ByhXkW20

Ho layout update 2/2/15

I have been working on roads, bridge, car card and waybills for HO layout.

https://www.youtube.com/watch?v=whh4br2LLOc

O gauge layout update 2/2/14

I have been working on signs,car card, waybill and staging.

https://www.youtube.com/watch?v=zz0Tm6Ra_Ys

Coal and Steel RR operating session 1/19/15

We had an operating session on my layout a couple of weekends go , We had 4 operators the first hour and 3 operators the rest of time, Everybody had fun.

 

 

o guage Layout Update 1/14/2015

I have been working on wiring on the Coal and Steel RR main line, Prr staging branch, more on the interchange yard and working on sins for operators.

https://m.youtube.com/watch?v=Ks2q84B9HWE

Coal and Steel Railroad and Prr, Family operating session

My o gauge layout is built for operation. Jon has attended an ops before and my mom has not. Jon and me were the train crew and mom was dispatcher. we were using track warrant, switch list and block control.

https://m.youtube.com/watch?v=bBzEvdih000

​ https://m.youtube.com/watch?v=whVkSkQI6yY

​https://m.youtube.com/watch?v=KsEIVgd2QbA


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: