Track and electrical/DCC

Fast Tracks's picture

The Last Spike (ok solder joint)

Finally.

June 14, 2009 at 10:00pm I soldered the last PC board tie in place, effectively completing all the trackwork for my CNJ Bronx Teminal layout.

A rough estimate puts the final tie count at about 4000, all soldered in place one at a time.  About 8000-10000 solder joints.

Rio Grande Dan's picture

Soldering Tips That will help make you a Pro

Hello all, here is a Tip or 2 to keep the solder out of un wanted spots on your Fast Tracks projects

n scale 0-8-0

Anyone install a decoder in the Walthers/lifelike n scale 0-8-0? If so which one did you use?This has a factory installed 8-pin plug.

  Thanks

Auto Frog Reverser

I got wind of this great little circuit from Tim Warris' post on his CNJ Bronx.  I found this video testimonial and thought I would share it with the MRH community.

Tam Valley Depot has a few other interesting circuits too.

 

 

Fast Tracks's picture

Bronx Terminal Project Update

Getting closer to operation!

 

dsc_5129

Scarpia's picture

Help with blue points

I've now spent a fair amount of time finagling with the blue point turnout controllers I chose. Out of three in place, only one is providing satisfactory throw strength for the Fast Tracks turnouts.

Fast Tracks's picture

Digitrax DS-64 - Number of possible routes on a layout?

Hi,

Here is a question I can not seem to find an answer to anywhere.  If using multiple DS-64 stationary decoders to operate Tortoise switch machines, how many routes can be set up?

Fast Tracks's picture

Turnout Torture Test

Hi,

I have completed the installation of some of the Tortoise switch machines. One half of the layout has them in place, including the section of track with 8 sets of switchpoints.

Fast Tracks's picture

Assembling Track Sections for the CNJ Bronx Terminal - HD Video

Hi,

Carrying on from my last video where I cut the electrical isolation gaps in the sections of track, here I start to assemble all those pre-built sections into a single unit.

Fast Tracks's picture

Gapping complex trackwork - HD Video

Hi,

This past week I spent working on my CNJ Bronx Terminal layout in an effort to get it operational for the NMRA Train Show this coming July.

Still a long way to go, but I made some good progress.

I finally was able to cut all the electrical isolation gaps in the trackwork, a job I have long wanted to do but hesitated as it makes the track sections a bit weak, and until they are permanently installed in place I was worried about damaging them.


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: