Modeling topic
Cracked Gears on Lionel HO UP Turbine?
I have an HO Lionel Veranda Turbine that has at most 30 minutes of run time on it. I bought it new, shortly after they came out and after a bit of running on my old layout, I moved and it has been stored in a closet inside the house ever since.
I recently took it out to run and it had the dreaded click and bump from each wheel rotation that I have found so often in P2K GP 7/9's. However, with the Turbine it only happens when running FWD. I have been told that NWSL make a replacement gear #2462-6 12T but I can't get the axles out!

Jointing sand for ballast [updated]
Earlier I had posed the question wether or not Stone dust or Jointing sand would be usable for ballast, and after some great responses I decided to get some and try it. I ended up getting a 20kg bag of jointing sand (the stone dust appears to coarse for HO). So I get home, grab a bucket, open the bag and...
It's all CLUMPED!!! I will have to dry it out before i can use it, Any recommendations for drying?
Electrically Conductive Lubricant
I could use some advice. I have 2 Athearn Genesis sound locos (an F7A/B and an MP15) that have the dreaded intermittent electrical pickup problems. I have NWSL wheel sets on order that were recommended on Tony's Train Xchange website as a fix to the problem. The fix says to use the wheels plus Electrolub in the journal cavity. Problem is, I don't know that electrolub is available any more.
Does anyone know of a readily available substitute for Electrolub?
Thanks,
John C
HAPPY HOLIDAYS FROM THE MEC/LVRC
HEY GUYS SORRY FOR THE DELAY IN POSTING BUT IVE BEEN HAVING SO MUCH FUN WITH THE LAYOUT.but first we see MEC 254 with a pass extra. and LVRC hauling the same train a few hours later on a far holiday trip. and we even see a rare Allagash hopper outside of Maine and even get to see the 254 hualing local after we head back to St. J but to everyone. Merry Christmas and happy holidays

Tree line....
Hi all,
well with the Mrs. in Italy visiting her dad who is not doing well, I had to do some thing to not start turning in circles with the Christmas spirit and such.
So I decided to re do some of the tree line. You all might remember this...
but when ever I entered the layout room I was like "pffffffft" not really what I was after when I was doing this tree nursery.
Bachmann shay with tsunami sound
Help, I have a bachmann shay with a tsunami sound decoder. When I place it on the tracks it sounds good but when throttle is applied it sputters. When placed on test wheels it runs without the sputters. Any help is appreciated.
Merry Christmas to all.
SUGGESTIONS FOR A MODULAR LAYOUT
HELLO RAILROADERS !
I AM AKSHAY AND I AM FROM INDIA , I WANT TO MAKE A LAYOUT WHICH SHOULD HAVE A YARD , SOME STATIONS , ONE OR TWO JUNCTIONS , INDUSTRIES AND SOME MINES !
BUT I WANT ALL THIS TO BE LESS THAN 150 SQ FEET .
I NEED SOME SUGGESTIONS!

Shelf Layout Turnout Options?
I've been working on a new shelf expansion on my layout. This section is 59" from the floor and the track is no more than 16" deep. There are two main lines running through the middle and they will be on cork 3/16" thick. The yard spurs off to the sides will be on foam 1/16" thick. The roadbed is 1" foam insulation board on 1x4" framing.
>> Posts index

Navigation
Journals/Blogs
Recent Blog posts: