Robin W's blog
Aunt Minnie's Farm, from memory....
Hello to Rail Road Modeler's !!!
This picture here is a corner diorama that has survived from the previous layout, I plan on adding this into the new layout i am currently building, and designing as i go.
New Edition to the WMT ScrapYard: SCale House and Truck Scale
The WMT Scrap Yard has finally built a scale house to weigh the loads coming in.
Power Station going in next to the
Hello to all, here is the next addition to the layout.
It will now be referred to as the W.M.T ScrapYard
So what do i do in all my spare time, when im not working.. spending time with Boy, and wife..
at a 108 degrees on average right now, so its too hot to do yard work or be outside , since i work in it during the week,
I have been comfortably assembling the Baler and the Shear in the comfort of 76 degree ac, and detailing up the diorama of the Wrecked mans treasure Junkyard from henceforth be short end to The "WMT ScrapYard"
The Wrecked Mans Treasure Scrap Yard
As Promised here are the Pictures of my Scrap yard,
I built the crane by using an old Railroad crane and kit bashing it some Bulldozer treads
the Scrap metal is actual scrap shards from metal milling. For the ground coverage i combined Woodland Scenics Fine Turf,- Soil, Earth and burnt grass , medium green. and some saw dust
sprayed it down with some Alcohol mix , and glue water mix applied with a squirt bottle. Background is actual
pictures from Indiana
Establishing "The Wrecked Mans Treasure yard"
Ok so i have started to Create Scenery and have changed the name from Rusted Treasure The Wrecked Mans treasure Scrap Yard. started shaping the Foam and adding the muck and scrap ..pictures coming soon.. Meanwhile a little back story. ......
Out with the Old in with the Hmm Part II
Ok so , i have started the Benchwork for my new layout, this section is 2'x4" and is labeled The Rusted treasure Scrap yard ... well for now its called that.
started mounting the Shelving style benchwork at 11Am By 3:30 the sub bed and homosote road bed and track have been installed. Wired and soldered ready for paint and ballast.
last picture i started experimenting with the layout of the scenery for the Scrap Yard
Out with the old and in with the ...hmmmm
Well i am again in deep thought on developing a new layout, and needing motivation ... i just cant seem to settle on a good mainline layout and work my industry's into the right area to be realistic to prototype. inspired by Ken Rice post from a few days ago I went on to Google maps and found several industries i would like to have on my layout. ..Lumber, Propane /gas/petro, general warehouse shipping, Quarry /crushed stone . set in the area of central Indiana era 1972 -82' ish..
Update on the reverse loop with the quarry Scene
Greetings fellow modelers of the greatest hobby on earth. I have been busy with the quarrie scene here are the latest pics. I have plastered the and started shaping the dig site, and adding color.
Stone Quarry construction has begun.......
As you can see the workers are diligently working to create corridor for Truck traffic so that production of high quality styrofoam stone can be readily available..lol
.
Ok now for the real stuff, this pic is of the benchwork, and the next is the sub layers to support the soon to be quarry
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: