Long Haired David's blog
Rebuilding my Router software to suit me
As I have mentioned, I have been working on a software project to complete my Open University degree. This project was named 470Router - 470 after the code for the OU course - TM470 - and Router as it was intended to be used to create freight car routings for my model railroad. Well, I finished the degree (got a 2.2 and was awarded a B.Sc. Hons) and went off to do other things (mostly building some plastic scale model cars - Gentle Scale Modelling).
Building JMRI routes on the S&NE
As I now have a system for car routing and train management, I need to move on and get JMRI working for control of the track. Ideally, I would like have JMRI controlling all of the points and then, as I have a defined set of trains, a route set up for each of those trains.
Sunset & North Eastern R.R. - extending the staging
Having finished with the routing software, I found that single line staging at both ends, although it seemed to be OK, wasn't going to work. I decided to make both staging to be double track. This involved the following:
-
Purchasing 2 new switches
-
Purchasing 2 extra switch motors
-
Taking down the old track
SNE final track plan
I put my track design on the Model Railroader Track forum for comments and had lots of help sorting out what would work and what wouldn't. There were concerns that I had done the usual trick of overestimating how much track that can be got onto a board and one commenter thought that I had used #2 turnouts to make everything work. In fact I had been a little ambitious but, with a bit of reorganising,I was able to get the basic layout to fit.
SNE - joining the foam core together
I have spent the day today connecting everything together. I have planned out the new layout. This has been amply discussed on the Model Railroader Magazine Forum.
SNE - Foam Core is down
I have now laid out all of the foam core. It all fits very nicely and very tightly. It is 80mm high to accommodate the DCC Concepts point motors.
New Boards for the S&NE
Further issues with my arthritis have caused me to dismantle the layout that I was building on the kitchen units. There were two problems with it. Basically, the return curves were too tight and I was getting a lot of issues with stock coming off the track. Secondly, it required that I stand up to build the railroad and also to do the switching.
Blair Line Sam's Roadhouse on the S&NE
I needed a "seedy" building just outside the gates of the freight yard and Blair Line's Sam's Roadhouse seemed to fit the bill. Their description is:
GC Laser Ice House on the S&NE
My next project after working on the yard area was to get the layout moving again. I hadn't cleaned the rails since I laid the ballast so I knew that there was going to be some issues. I had a cash Christmas present so I spent it on the Woodlands Scenics track cleaning andloco wheel cleaning equipment.
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: