Fast Tracks Turnouts

Scarpia's picture

Well, here's the first attempt.

Needless to say, I was very pleased. This is a  code 83, HO, number 6. I know Tim has better videos, but I couldn't resist giving it a whirl.

I'm new to soldering as well as to the hobby, so I think it's a testament to the Fast Tracks products, as well as their excellent videos and references that this turnout works as well as it does on my first try. For those interested, it took me about an hour and half to assemble this turnout.

The only problem I've run into so far is that the turnout ties I ordered from Fast Tracks are a bit thicker than the ones from Micro Engineering, and they don't match either the copper cross ties or the MEs. I know sanding will take care of that, but there it is.

I have a question for anyone who has or has made this (or Tim, if he notices this post).  Is is a bad idea to use different rail sizes in the same switch?

Let me explain. I'd like to make a single crossover, from the main (code 83) to a Siding (code 70).  if i mix codes, especially at the frog point, will this cause performance issues, or am I better off starting the smaller rail after the turnout?

Here's an illustration to show what I mean about which code to go where.

Comments

Scarpia's picture

Now it's become assembly line

Now it's become assembly line work - I sat out side yesterday afternoon, and made the parts for 2.5 turnouts (ran out of rail) on the back porch. With all the parts cut and measured, it was short work to go in, fire up the soldering iron, and spit out two more complete turnouts. Happily these passed all electrical tests immediately, especially now that I've remembered to gap both areas.

I understand how a lot of modelers don't wish to spend their time this way, it is appealing to simply purchase the track, lay it down, be operational, and move onto other things. I have to say though that I'm greatly enjoying this process, and the slower pace might be a good thing for me as I can be impatient at times. It's also very nice to have a very intimate knowledge of the trackwork.


HO, early transition era www.garbo.org/MRR local time PST
On30, circa 1900    

 


>> Posts index


Journals/Blogs

Recent Blog posts: