mgazaille's blog

Benchwork analysis paralysis

Logically I would wait until I had a relatively finalized track plan but since the train room also serves as storage (underneath and possible above) and laundry room, I have to move forward on that front.

I have acquired single track shelving and "16 brackets like below

 

Track plan musing

Instead of following my own advice and figuring out and figuring out what kind of traffic the St-Jean sawmill complex would generate (In: logs, empty woodchip gondolas/ box cars, equipment on flat car Out: full woodchip, pulpwood, box car + empties), I gave each location a name and draw something to give me an idea how things would look like if the line to St-Jean mill and Belle Station only connected via LeChat yard.

Given and Druthers

No better way than to be being this blog than to start with Givens and Druthers.

Givens:


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: