wdfane's blog

wdfane's picture

Breaking Ground on the R&SW Spur

The first two days of this week were productive ones. In about 36 hours I managed to go from flat insulation foam to trains actually moving. This all thanks to the help of another local modeler, Eric.

wdfane's picture

Beginning the R&SW Spur

This blog is designed to keep track of construction of my layout modeling the IC&E Rockford Sub in HO scale. The specific modeling areas include West Yard in South Beloit, Illinois and the line east of Beloit Junction, Wisconsin (the former Milwaukee Road "Racine and Southwestern" line). The focal point of the layout will be the switching operations at the Frito-Lay plant in Beloit, Wisconsin during the late 2000's and into the present day.


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: