brubaben's blog

Weekend Sewer Pipe Load

Concrete Sewer Pipe Load in a Weekend

Two Switches

A new layout with only 2 switches....

The time has come in my modeling journey to try something new.  I have decided to follow the minimalist approach of less track and more operation.  Thanks to Lance Mindheim and others online, I have decided to build a layout with only two switches.


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: