SteveWatson's blog

MRH 120-day Challenge: I hope Tim Warris doesn't sue me for patent infringement....

A month after my first post, I finally get to laying track, starting with the double-track passenger station. I was planning to use Fast Tracks Sweep Sticks + Space Gages to straighten the track and control the spacing, however I discovered that for some reason I only ordered two of the straight Sweep Sticks (ie. 40" total, not enough to lay two parallel 6' tracks. Not really even enough to lay two 3' sections at a time). And here it is, Saturday of a long weekend -- what to do?

And so, it begins....

Since I just got the room finished, and am starting to do Real Work, Brian Michael's "120-day challenge" (a.k.a. "Get something done on your layout this summer") came along at a good time. So here's my N-scale Algoma and Northland Railway as of yesterday:

StevesBenchWork

Testing...testing....

First post, just to see if anyone actually reads this....

OK, some content just so I don't look like a pathetic attention-seeker. Here's a Mail Pouch barn we found down a rural highway in eastern Kentucky, back in August:

A little Googling informs me that there are still quite a few of these around -- but not in my part of the world (southern Ontario) and this is the first one I've seen in the wild (as opposed to pictures of a model on someone's layout).


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: