Roger Litwiller

Testing tracks and running after placing and gluing the new CN Intermodal Yard scene on my layout, the Trenton Subdivision in N Scale. Operation is with track pickup only. Once the glue is dried I will attach the track feeder wires below the layout. I have installed a feeder for each yard track, between each turnout and the yard lead track. Prior to placing the scene I mucked up the concrete pad, roadway, parking areas and gravel shoulders with diluted oily black paint a soot weathering powder. 

Next will be blending the scenery between the new yard and the layout.

Roger Litwiller -Author

View my layout, "Trenton Subdivision in N Scale" on the Railroading Page on my website.  rogerlitwiller.com

READ my MRH Blog.

Reply 0
Reply