Gregory Latiak GLatiak

[attach:fileid=/sites/model-railroad-hobbyist.com/files/users/GLatiak/20170516_203955_001.jpg]

Slowly moving forwards. Some of the water effects on the falls, scenic'd the rubber rock, got the track glued down on the bridge. Not everything properly glued down yet. Haven't quite finalized on how the last bit of bank on the right side will be done -- the proptotype has a blocky stone wall. Might do something like the little retaining wall on the right side of the arches -- blue foam cut to shape and painted. Quite surprised at how it turned out. Have flextrack approaching the bridge on both sides -- the far end is a simple 24" radius curve, will replace the last foot with a piece of sectional of the right size. The approach coming down from the hill is a bit trickier -- right now its flextrack as well, but there is a 30" radius 'S' curve that will probably be more stable if i solder up a section with the rails bent to the right shape. Had to do that on the upper level where the divergent route to that upper bridge kept creeping out of position. Anyhow, this is where things stand as of tonight.

Gregory Latiak

Please read my blog

Reply 0
Reply