This is the update for 12 December 2015. The construction of the layout finally reached the Union Station (aka Kansas City Union Station) yard area in early December. I've left this area to the end because it will have the most complex construction piece, the engine facility in the middle of the east helix. Hopefully over the next couple of weeks, I can get a couple of tracks installed to join the layout from one end to the other. I am in the process of planning the design of the support structure for the engine facility that will be placed in the middle of the east helix. The structure will have a couple of key items, namely, allow me to sit under it to clean the helix tracks & have a pop-up area to allow maintenance on the track near the back wall. More to come on that in the future.

The following pictures show various parts of the Union Station yard.  I am working on the passenger train section of the yard first which includes industries along the back and side wall.

This picture shows the east end of the yard. Two of the passenger tracks are getting really close to connecting to the east helix (about 6 more feet).
st_end_0.jpg 

The picture below shows 5 of the 7 passenger tracks.  The polarity car is still being used to verify track feeder locations.

tracks_0.jpg 

The picture below shows the west end of the yard. The tracks in the foreground will be for freight as well as sidings for icing platforms and a freight depot.


st_end_0.jpg 

The picture below shows a close-up view of some of the turnouts on the west end of the yard.

rnouts_0.jpg 

The picture below shows an overall view of the Union Station yard looking toward the east helix.

l_view_0.jpg 

Finally, this is a picture of the wall above where Union Station will be installed.  The signs represent all of the different railroads that will serve Union Station.  The only through trains will be from the ATSF while the others will run from staging to Union Station and back to staging.

ailroads.jpg 

More to come after the holidays.

Blog index:  https://forum.mrhmag.com/post/jmt99atsf-blog-index-12219303
Reply 0
pldvdk

Helix

Looks great. I especially like the track layout of your yard. 

I've seen your splined helix in past posts and have always been impressed by the quality of your construction. On your video I couldn't help but notice the horizontal threaded rod that was part of the upper level of your helix. Just curious, what does that rod do?  

Keep up the great work! Looking forward to your future posts.

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 0
jmt99atsf

Helix

Paul,

Thanks for the question about the helix.  Each section of the helix was joined with the next section at a joint that was aligned with a biscuit.  Some of the helix sections wanted to have a bit more curve (maybe a memory built in when being glued together) at the joining point.  When this occurred, I just cut a short section of threaded rod and added them to each side of the offending joint to force both sections to be straight at the joint.  These forcing rods were threaded thru 4 eye hooks (2 on each side of the joint).  The picture below shows a closer view of two joints that were fixed this way. Hope that answers your question.

oint_fix.jpg 

John

Reply 0
pldvdk

John...

Thanks for your answer. An innovative and ingenious solution. Well done!

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 0
Reply