jmt99atsf

Over the last few weeks I have been able to complete the DCC wiring for section 3 (aka power district 3) of the main level of the N-Scale ATSF Paradigm Division.  There are now 6 of the 8 planned sections or power districts wired for DCC and operational. Back in late August, I spent a day participating in an operational session at a friend's layout in San Antonio.  That experience encouraged me to re-look at some of the operational functionality of my layout.  Thus the changes were made.

This is the section of the layout shown in the picture below. The changes to the track plan for both Jamestown & San Angela are annotated on the picture.

d_091215.jpg 

The first video is basically a walking tour of the main level that has been recently had its DCC wiring completed and tested.

The video below shows one of the DCC tests that was done to check out all of the track, sidings, and turnouts. So far so good. 

I plan on starting work on the next section/power district this week.  I am still working on the 4-8-4 Northern project engine (ConCor GS4/Bachmann 4-8-4). More on the 4-8-4 at a later date.

My YouTube channel is - https://www.youtube.com/user/tanzj

Blog index:  https://forum.mrhmag.com/post/jmt99atsf-blog-index-12219303
Reply 0
Danno164

It looks great...best wishes.

It looks great...best wishes.

Daniel

Reply 0
jmt99atsf

Thanks

Thank you for your kind words, it is greatly appreciated.

Reply 0
rwcanuck

layout

yes, it really is coming along well.   looking forward to your next update...

Reply 0
jmt99atsf

Next Update

Thanks. 

The cork roadbed is in place for the next section of mainline and ready for track installation. Took the weekend off to work with a friend of mine at this weekend's train show in Temple, TX.  The next update will probably be another couple of weeks.

John

Reply 0
Reply