Home / Blogs / ferroequinologist1's blog / Ten Years Later & I Work On Rolling Stock
Ten Years Later & I Work On Rolling Stock
Wed, 2012-08-15 14:03 — ferroequinologist1
To All: Some rolling stock projects of mine were started years ago! I have since finished them
or added details, such as underframe brake lines and components, brake hoses
(I cut off the Kadee ones), install #58 Kadee couplers, semi-detail locomotives and
weather them or add details to buildings, or repair them.
Yours, Elvin Howland/E. St. Louis Rail Group Layout
- ferroequinologist1's blog
- Login or register to post comments
- Tweet Widget
- Google Plus One
>> Posts index
User login
Navigation
Recent blog posts
- Stratch built plumbing supply store.
- BEST TRAIN WATCH VIDEO YET
- Recent Rolling Stock Projects
- Ronny's Pawn completes the first block of Hammerjacks
- Putting them all together
- The Colorado and Southern in Sn3
- Building a GE 85 ton steeple cab: available for printing.
- Building turnouts N scale-Bonneville and Guadalajara RR
- Introduction & my TT-scale models
- Small Battery Powered Drill Motor
Comments
Congrats
Elvin,
Congrats on actually finishing projects. Sometimes it's very hard to finishing anything.
What is your next step?
-Al
Continuing Projects
Al: I have an indoor theater to put together (need to pick it up at the Hobby Shop).
Also ordered 100 metal wheel sets, Tichy Roofwalks and a NKP GP7 w/sound.
I replace all Athearn roofwalks with Tichy. I use the Athearn roofwalks for tanks
that I build. I have some tank cars to letter and weather for my layout. I haven't
decided on the roads, however. I will have pix of these projects.
Yours, Elvin (aka Al) Howland/E. St.Louis Rail Group Group Layout
Cool!
Looking forward to you pictures!
-Al