mikedeverell

The week building continues the helix and staging yards are first. The helix is a 2 and 1/2 turn on a 1.7% grade with the outside radius bing 37 inch and the inside 34 inch. But wait for it.... yes through a wall one side in my wood shop and the other in the layout room. Here are a few photos.

Mike

IMG_2701.jpg 

 

 

IMG_2704.jpg IMG_2703.jpg 

IMG_2696.jpg 

Mike Deverell

Colorado Front Range Railroad

https://www.youtube.com/channel/UCxQthaWz7aYFp_FIu5qqs4w

Reply 0
Ed Eaglehouse Suncat2000

Nice option

That's a smart use of space, since you can spare the shop area. Looks like you're doing a good job. It makes me think, though: it's really too bad we can't just put a mirror on the wall and physically double the rise!

Ed Eaglehouse
Reply 0
Matt Goodman

Man, you work fast, Mike.  Is

Man, you work fast, Mike. 

Is that 1/8" material (luan, maybe) that you're using for the helix?

Matt Goodman
Columbus, OH, US
--------------------------
MRH Blog
VI Tower Blog - Along the tracks in pre-war Circleville, Ohio
Why I Model Steam - Why steam locomotion is in my blood

Reply 0
Reply