jmt99atsf

 

The track, turnouts, and electrical have all been completed for the changes that were discussed in parts 1 & 2. An initial portion of the passenger station has been placed to ensure clearance for trains. The video above is in two parts, the first showing the overall changes & the second is a track level ride along into the station. 

 

ised1017.jpg 

 

 

This picture above shows the revised track alignment for the Elizabeth City (Tulsa) to accommodate the station and changes to the REA Express/Freight sidings, and the refinery/oil loading facility.

 

Work continues on the lower level of the station. More to come in the future…so stay tuned.

 

 

My YouTube Channel is -  https://www.youtube.com/user/tanzj

 
Blog index:  https://forum.mrhmag.com/post/jmt99atsf-blog-index-12219303
Reply 0
Reply