scott barcoola

Hi All

some links to construction of my new layout

day three I build the frames (no base support) see if they all fit together on the decking.

http://barcoola.blogspot.sg/2017/04/third-day-new-layout-progress.html

day five My "bathtub" boards are taking shape, the bottom of the boards are 3mm MDF, this creates a smooth surface for moving the boards and protects the wiring, finally gives some torsional strength.  

http://barcoola.blogspot.sg/2017/04/the-fifth-day-of-new-layout-progress.html

day seven shows my "bathtub" concept Boards getting bus wiring.

http://barcoola.blogspot.sg/2017/05/the-seventh-day-of-new-layout.html

 

 
https://barcoola.blogspot.com.au/

Modelling the Australian Desert in HO scale: Barcoola and A Town Like Alice.

Modeling the Australian National Southline: Murray River Bridge.

Scott

 

 

Reply 0
Reply