PeterAtt

This project is coming to a finish as I add the warehouse dock and overhang. also add chimney to main building and trim. If you missed the other parts of this build they can be found on my Blog here:  https://forum.mrhmag.com/journals-was-blogs-891775

 

 

We’ll start with the warehouse loading dock first. parts laid out and removed.

 

 

 

Dock assembled.

 

 

A light coat of wood aging stain. my own concoction of bits of steel wool fermented in vinegar.

 

 

Front cross braces installed. These are peal n stick.

 

 

Glued to front of the warehouse.

 

 

Next the chimney with a few coats of tuscan red acrylic.

 

 

Gluing in place.

 

 

I applied a touchup coat of the red and then applied a medium wash around the top of chimney, to make look a bit used. I used a Derwent water color pencil. just wipe the end of the pencil with a wet brush and apply.

 

 

Here’s the loading dock overhang. It has the same rolled roofing as the roof of the building.

 

 

Overhang installed and set in place on the layout and a few pics of different angles.

Hope you all enjoyed this I know I enjoyed building it. And now on to the next project.

 

 

 

 

 

 

 

 

Reply 0
Barry Rosier bsrosier

False Front Project

Peter,

That looks fantastic. Great job bud.

Barry Rosier

Barry Rosier
Strasburg Model Railroad
NMRA Member
Reply 0
PeterAtt

Re looks fantastic

Thanks glad you liked it.
Reply 0
Reply