richhard444

Here is part #3 of building Iron Mountain, MI.

Laying out & painting of roads etc. I hope this post isn't to long. I did cut out a lot of in between pictures

Finished parking lot & road into Iron Mountain. Follow along to see how I got to this point.

11%20326.jpg 

Finished road into Iron Mountain

11%20325.jpg 

Finished bridge area. follow along to see how I got there.

11%20329.jpg 

Layout of the city structure base with the sidewalks marked off. This piece is .040" sheet styrene. It will get glued onto the sub base that was laid out for the streets.

in%20043.jpg 

Lots of paper & tape

in%20028.jpg 

Grey auto primer.

in%20030.jpg 

More styrene sug base & road layout.

in%20031.jpg 

Painting the grade crossings. I scribed the planks into the basic road way for the approaches & made a styrene insert for the between the tracks.

in%20032.jpg 

20039(1).jpg 

Putting the tape down for the center line markings.

20041(2).jpg 

Taping for road markings.

in%20042.jpg 

Taping the bridge for painting the line marking.

in%20045.jpg 

More news paper & tape.(Should own stock in these companies)

in%20046.jpg 

Road markings.

in%20047.jpg 

Road & Parking lot markings.

in%20048.jpg 

Road Markings.

in%20049.jpg 

Richard - Superintendent CNW Peninsula Div.

blog - https://mrhmag.com/blog/richard_harden

Reply 0
mark_kroll

Looks great!!!

Looks great!!!

Reply 0
Reply